Planejamento e gerenciamento na construção civil: caso de um shopping
Keywords:
planning, control, production.Abstract
Aiming at optimizing activities, civil construction companies are increasingly seeking to make use of tools that help in the search for this total efficiency. In this sense, a well-executed, implemented and controlled planning, with a detailed schedule is a fundamental tool. This work seeks to analyze an existing planning, elaborated and followed by the MS Project software, of the work of a Shopping Mall. From weekly data collection on the execution of some services, a weekly planning was elaborated with the tool called PCP. This work presents a simple tool based on the Last Planner system, the PPC. The system was applied in the work over a period of eight weeks, with the aim of detecting the main reasons why part of what was planned was not fulfilled. The results presented in this work show the reality of civil construction; difficulty in sizing, demand conflicts, weather conditions (which are generally not considered when sizing activities), lack of prerequisites and changing priorities were the main reasons why pre-established targets were not met.
Downloads
References
BERNARDES, M. M. S. Desenvolvimento de um Modelo de Planejamento e Controle da Produção para Micro e Pequenas Empresas de Construção. Tese (Doutorado em Engenharia). Universidade Federal do Rio Grande do Sul, RS, 2001.
IBGE. Instituto Brasileiro de Geografia e Estatística –IBGE. Panorama de Anos Recentes 2020. Disponível em: < https://biblioteca.ibge.gov.br/index.php/biblioteca-catalogo?view=detalhes&id=754>.
KEMMER, S.; HEINECK, L.; BRITO, F.; BEZERRA, B.; & CARDOSO, H. Planejamento de médio prazo: contribuição ao gerenciamento do plano com base em aplicação prática. 2006. Disponível em: < http://docplayer.com.br/62651556-Planejamento-de-medio-prazo-contribuicao-aogerenciamento-do-plano-com-base-em-aplicacao-pratica.html >.
MACHADO, R. Um modelo de PCP de curto prazo para a construção civil. 2009. Disponível em: < https://www.researchgate.net/publication/333745178 >.
MATTOS, Aldo D. Planejamento e controle de obras. 1. ed. São Paulo: Pini, 2010. 420p
MERGH, L. S. Análise de Indicadores da Gestão de Produção em Obras Corporativas. 2019. Dissertação - Programa de Pós-Graduação em Construção Civil - UFMG, Belo Horizonte - MG, 2019.
PEREIRA, A. Desmitificando a Curva S. 2010. Disponível em: http://gerenciamentoprojeto.blogspot.com.br/2010/04/desmitificando-.
PMBOK. Um Guia do Conhecimento em Gerenciamento de Projetos (Guia PMBOK)/Project Management Institute. 6ª. ed. Newtown Square, Pensilvânia: [s.n.], 2017.
PRADO, Renato Lucio et al. Aplicação e acompanhamento da programação de obras em edifícios de múltiplos pavimentos utilizando a técnica da linha de balanço. 2002.
PRAVIN, S. N. K., MURALI, K., SHANMUGAPRIYAN, R. Review on Climate and its effects on construction industry. International Research Journal of Engineering and Technology (IRJET), www.irjet.net, Volume 04, Fascículo 11, p 1179 –1183, Novembro 2017.
SILVA, B. G.; ZAFALON, A. A. Construção civil: importância do planejamento de obras. Revista Científica Semana Acadêmica. Fortaleza-CE. Edição 158. V.1. Ano 2019.
SILVA, D. P.; NASCIMENTO, M. V. L.; SANTOS, T. C.; SILVA, T. M. T.; ARAÚJO, R.; TABOSA, J. H. R. C. Planejamento e gerenciamento de obras: variáveis que ocasionam atraso na construção civil. Braz. J. of Develop., Curitiba, v. 5, n. 12, p.31190-31204dec 2019.
SILVA, L. A. O impacto da multidisciplinaridade no planejamento e controle de obras. TCC, Publicação 07, Curso de Engenharia Civil, FACEG, Goianésia, GO, 33p. 2019.
SILVEIRA, Mateus Henrique; SANCHES, João Carlos Machado; DOMINGOS, Renata Mansuelo Alves. Impacto da ação meteorológica no cronograma de execução de estacas hélice contínua. E&S Engineering and Science, v. 12, n. 2, p. 1-13, 2023.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Revista Interdisciplinar de Pesquisa em Engenharia
This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
Given the public access policy of the journal, the use of the published texts is free, with the obligation of recognizing the original authorship and the first publication in this journal. The authors of the published contributions are entirely and exclusively responsible for their contents.
1. The authors authorize the publication of the article in this journal.
2. The authors guarantee that the contribution is original, and take full responsibility for its content in case of impugnation by third parties.
3. The authors guarantee that the contribution is not under evaluation in another journal.
4. The authors keep the copyright and convey to the journal the right of first publication, the work being licensed under a Creative Commons Attribution License-BY.
5. The authors are allowed and stimulated to publicize and distribute their work on-line after the publication in the journal.
6. The authors of the approved works authorize the journal to distribute their content, after publication, for reproduction in content indexes, virtual libraries and similars.
7. The editors reserve the right to make adjustments to the text and to adequate the article to the editorial rules of the journal.